Skip to main content

Azito Energie

Debt : July 2019

The Azito gas power plant is located 10 km from Abidjan. It is a 430MW combined-cycle gas-fired thermal power plant.

Amount

€ 15,000,000.00

Type of investment

Debt

Development impacts

  • Private sector consolidation/innovation
  • Access to basic services & goods

Beneficiary locations

Africa: Côte d'Ivoire

Investment field

Infrastructure

Activity

Energy

Organisation

Azito Energie

Domicile

Ivory Coast

More investments in

Azito Energie

  • Debt € 17,760,600.00 (2012)

The plant is composed of 2 gas turbines which started operations in 1999 (“Phase 1”) and 2000 (“Phase 2”) and a steam turbine that started operations in 2015 (“Phase 3”). Azito is one of the first and the largest Independent Power Producers in Ivory Coast.

In 2012, BIO together with other DFIs, jointly financed Azito Phase 3 project, which added a steam turbine and converted the existing plant from simple-cycle gas fired, to more efficient, combined-cycle technology.

In response to a growing electricity demand and an excellent performance of the plant, further expansion of the installed capacities were considered. Azito Phase 4 is a 253MW combined-cycle expansion project, which will bring total installed capacities of Azito plant, up to 710MW. The expansion will benefit from a less energy-intensive technology, 50% more efficient compared to an open cycle power plant with the same capacity, which will make it the most efficient in the country.

Development impacts

  • Private sector consolidation/innovation

    Through its energy efficient combined-cycle technology, Azito contributes to optimizing energy system of Ivory Coast, by limited gas usage, high thermal efficiency and lower tariffs, the project shall help reducing overall system's costs, ultimately benefiting end-users.

  • Access to basic services & goods

    Once Azito 4 is fully operational, it will supply almost 2.000 GWh p.a. and on a combined basis (entire Azito 700MW plant) will generate over 4.500 GWh p.a., accounting for approximately 30% of total national generation and therefore making the plant of strategic importance in Ivory Coast.

View more of our investments in this region

Société de Microcrédits Congolais

5,000,000.00

  Democratic Republic of Congo

  01/04/2026

Enterprises

Orchidia Pharmaceutical Industries

8,100,000.00

  Egypt

  01/02/2026

  Equity

Enterprises

Limbua Group

 141,025.00

  Kenya

  01/02/2026

  Subsidy

Investment Companies & Funds

Kampani

 2,000,000.00

  29/01/2026

  Equity

Financial Institutions

Vital Finance

 3,000,000.00

  Benin

  13/01/2026

  Debt

Investment Companies & Funds

Adenia Entrepreneurial Fund

15,000,000.00

  01/01/2026

  Equity

Infrastructure

Bandwidth and Cloud Services

15,000,000.00

  Democratic Republic of Congo, Malawi, Mozambique, Zambia, Zimbabwe

  01/01/2026

  Debt

Infrastructure

Sawa Energy

 29,500.00

  Uganda

  18/12/2025

  Subsidy

Enterprises

Biophyto

 2,750,000.00

  Benin

  01/12/2025

  Debt